Aussie steel plant: ‘performed exactly as we hoped’
In 2015, engineers at an Australian steel plant works discovered tar in an environmental-monitoring bore.
As part of the investigation and plan for remediation, the company put in a 2-foot diameter, 12-foot-deep well, topping it with a modified-extended version of Blackhawk’s versatile V-2 Pneumatic Piston Pump™ later in the year.
The engineers decided to link the discharge hose to a skip bin (dumpster), with an overflow hose for ground water return to the well. When filled, the bin is emptied using a vacuum truck. The tar is then taken to the company’s recycling plant.